Tel: 0141 883 8222 Email: enquiries@curtismoore.co.uk

  • Client: TfGM (Transport for Greater Manchester)
  • Architect: Aedas Architects
  • Main Contractor: Kier Construction
  • Location: Wythenshawe
  • Products: Kalzip Standing Seam, Protan Single Ply Membrane, Baileys eaves system
  • Value: £500K
  • Completed: TBC

Work has begun on the Kalzip roofing project at Wythenshawe Interchange in Greater Manchester. Curtis Moore started on site on 16th Spetember 2014, and works are progressing well on the structural decking to both the main and lower level buildings. Roofing build up and top sheet installation is expected to be complete within the next 6 weeks, and thereafter we will be off site pending a return in the New year to commence installation of the Bailey’s eaves system.